China-Myanmar Oil & Gas Pipeline Project (Myanmar Section)
PMC Headquarter of China-Myanmar Oil & Gas Pipeline Project (Myanmar Section) The gas pipeline is 1,015.5km long with the diameter of Φ1,219mm; the oil pipeline is 991.5km long with the diameter of Φ
West-East Natural Gas Transmission Second Line Project
PMC Supervision Headquarter of West-East Natural Gas Transmission Second Line Project The pipeline is 9,102km long with a diameter of Φ1,219mm.
PMC Project of Yongqing-Dagang Third Line Natural Gas Transmission Pipeline Project
Project Overview: Yonqing-Dagang Third Line Natural Gas Transmission Pipeline Project starts from Yongqing initial station, passes through Yongqing, Bazhou, Jinghai and ends in Dagang terminal station
PMC Project (Phase I) of Chad Crude Oil Pipeline Project
Project Overview: the pipeline is 320 km long with 1 first station, 1 last station and 8 line valve houses (including 4 RTU valve houses) along the line. Work Scope: responsible for preliminary desig
Niger oil pipeline project PMC project
Project Overview: the design flow is 100x 104t/a, the design pressure is 10MPa,the whole line is 462.15km long, and the pipe diameter is 323.9mm. It has first station, last station and 5 intermediate




冀公网安备 13100302000881号